CCI-Modified Bitumen Membrane is a Torch-applied bituminous felt reinforced with non-woven polyester mat and modified with APP elastomeric bitumen.

CCI-Modified Bitumen Membrane has cold flexibility property of -10°C.Produced in thickness of 4 mm CCI-Modified Bitumen Membrane is commercialized bottom and upper surfaces
protected by thermo-fusible PE film.

CCI-Modified Bitumen Membrane is a heavy duty felt reinforced with 250 gr/m2 non-woven polyester mat and used in civil engineering works; viaducts, bridges and tunnels on highways and railways.

Can be applied for upper layer of multi-layer build-up system or single layer.

INQUIRE / GET QUOTE

Usage and Properties:

-CCI-Modified Bitumen Membrane is a heavy-duty professional and reliable quality waterproofing membrane approved by highway authorities.

Waterproofing of civil works:

    • viaducts

 
    • metallic bridges

 
    • reinforced concrete highway and rail bridges

 
    • car parks

 
    • avalanche barriers

 
    • bleachers and roofs of the stadiums

 
    • tunnels and underground passageways

 
    • canals

 
    • dams

 
    • locks or docks

 
    • walkway

 
    • well casings

 
    • hopper

 
    • cut and cover

 
    • technical gallery

 
    • new construction or in the course of maintenance


  -For effective waterproofing water tightness alone is not enough.

-The waterproofing felt must possess a number of additional qualities; adhesion and mechanical resistance in order to resist to the effects of thermal expansion/ retraction, heavy traffic or other loading imposed damaging effects of all likely contaminants, etc. And resistance to the damaging effects of biological, chemical and physical agents.

-The waterproofing felt should also resist to aging degradation of the structure in order to maintain the water-tightness of the entire building. CCI Bitumen membranes have optimal mechanical and physical properties and their quality is ultimate in performance, versatility, and ease-of-use.

Test Report:

Serial
Number
Items Standard
Specification
Result Remarks
1 Mass per unit area, kg/m2 4.3 or higher 4.5, 4.6, 4.4, 4.5, 4.5 Passed
2 Area, m2/roll 10±0.10 10.01, 10.02, 10.01,
10.00, 10.01
Passed
3 Thickness, mm Average value ≥4.0 4.1, 4.2, 4.0, 4.2, 4 Passed
Minimum Value 3.7 4.0,4.0,4.01,4.02,4.01 Passed
4 Appearance End face inside out, mm Not exceed 10 3,5,6,3,7 Passed
Feeling condition The tire base should be soaked and there should be no unimpregnated areas. The surface should be flat, no holes, missing edges and cracks,
bumps are allowed
The tire base is soaked, surface is smooth, without
holes, missing edges, cracks or bumps
Passed
Open book When the coil is rolled out at any No cracks Passed
product temperature (4- 60°C), there should be no cracks or adhesion of more than 10mm beyond the length of 1000mm from
the core
Joints There should be no more than one, and the length of the shorter section
should not be less than 1000mm. The joints should be cut neatly and
lengthened by 150mm.
No splices Passed
5 Soluble content ≥2900 3156 Passed
6 Heat resistance 110°C Slide, mm Upper Surface ≤2 0 Passed
Lower Surface 0 Passed
Test phenomena No flowing or dripping No flowing or dripping Passed
7 Low temperature flexibility -15°C, no cracks No cracks Passed
8 Impermeable, 30 min 0.3 MPa 0.3 MPa, 30 mins waterproof Passed
9 Pull Maximum peak,N/50mm Longitudinal ≥800 865 Passed
Landscape 845 Passed
Test phenomena During the tensile process, there is no cracking or separation of the asphalt coating layer from the tire base in the
middle part of the specimen
There is no cracking or separation of the asphalt coating layer from the tire base in the middle part of the specimen Passed
10 Elongation Maximum peak
elongation, %
Longitudinal ≥40 48 Passed
Landscape 46 Passed
11 Mass increase after soaking, % ≤1.0 0.6 Passed
12 Hot Pull hold rate,
%
Longitudinal ≥90 97 Passed
Landscape 95 Passed
Elongation retention rate,
%
Longitudinal ≥80 87 Passed
Landscape 86 Passed
Low temperature flexibility -10°C, no cracks No cracks Passed
Size change rate, % ≤0.7 0.6 Passed
Quality loss, % ≤1.0 0.7 Passed
13 Seam peel strength, N/mm ≥1.0 1.1 Passed
14 Thickness of asphalt coating on the bottom surface of the coil, mm ≥1.0 1.2 Passed
15 Artificial climate acceleration Appearance No sliding, flowing, dripping No sliding, flowing, dripping Passed
Pull to keep aging rate, % Longitudinal ≥80 86 Passed
Landscape 85 Passed
Low temperature flexibility -10°C, no cracks No cracks Passed

General Application Steps:

  1. Clean and prime the substrate to properly receive a new, two-ply waterproofing membrane. Make sure the primer is completely dry before application.
  2. The movement of the torch should be a continuous to and from motion allowing the flame to cover the entire width of the membrane without burning the side of the adjacent sheet already installed.
  3. Heat concrete substrate when it’s cold. Verify that all roof openings, curbs, pipes, sleeves, ducts, vents, valley, ridges, box gutters, dormers, hips, eaves, rain water outlets, chimney, expansion joints or other penetrations through the roof are solidly set, and that all flashings are properly sealed.
  4. Side laps must be 10 cm and end lap joints must be at least 15 cm. The overlapping lines of base sheets at side lap joints serve as a guide for proper side overlapping.
  5. End laps are areas of possible infiltration of water due to an excessive thickness of membrane causing a void. After aligning end lap, perform a 45° angle cut at on all the end laps of the underlying sheet. Once the 45° angle cut is performed it will provide a smooth tapered transition. An asphaltic bleed out must be achieved at this transition location and at all the “T” joints formed by the succeeding courses.
  6. To prevent overly thick membranes, stagger the end laps a minimum of 30 cm relative to those of the base sheet.
  7. Use a geotextile as a separation layer prior to the application of the asphalt.

Note:

-Rain, frost, snow and high humidity can interfere with the adhesion of the membrane. With temperatures below +2°C it is better to avoid the application.

-Before application the substrate must be clean and dry. Standing water should be removed from the deck surface before recommencing laying operations. Special care is required during installation to avoid damage to waterproofing membranes.

-If it is impossible to restrict access to the waterproofing professionals alone, temporary protection must be employed to protect the membrane from the level of traffic.

Packaging:

    • Membrane: 1M x 10M

 

    • Primer: 20.0 Kgs

 

Note: 20Kgs of primer for 40sqm

Tools:

Roofing torch, propane cylinder, connecting hoses with regulator, trowel, knife and gloves.

Storage:

Protect material from heat and direct sunlight. Keep rolls in a vertical position and do not stack them.

SEE WHAT OUR SATISFIED CUSTOMERS SAYS

John Smith
John SmithProject Manager
Read More
"We've been using CCI Chemical's concrete admixtures and waterproofing solutions for several years on our commercial construction projects. The difference in quality is undeniable. Their products consistently deliver superior strength and durability, while the waterproofing membranes provide unmatched protection. Plus, their reliable delivery ensures we stay on schedule. CCI Chemicals is a trusted partner and a key contributor to our success."
Billy Wilsons
Billy Wilsons Project Lead
Read More
"When we were faced with a complex waterproofing challenge on our high-rise development, CCI Chemicals stepped in with their expertise. Their team promptly assessed the situation and recommended a customized solution using their advanced sealants. The results were impressive, and thanks to their efficient products, we were able to complete the project on time and under budget. CCI Chemicals knowledge and innovative solutions saved us time and money."
David Lee
David LeeCEO
Read More
"As a company committed to sustainable building practices, we were looking for construction chemicals that offered exceptional performance without harming the environment. CCI Chemicals exceeded our expectations with their eco-friendly product line. Their concrete admixtures deliver the strength and workability we need, while minimizing our environmental impact. Beyond the products, their customer service is outstanding. The team is always responsive and helpful, making them a pleasure to work with."
Previous
Next
SATISFIED CUSTOMERS
0
INDUSTRY SERVED
0
COUNTRIES
0

WE ARE LOCATED AT

SIGN UP FOR OUR NEWSLETTER TO GET WEEKLY UPDATES ON EXCLUSIVE OFFERS AND DISCOUNTS!

+63 917 579 0055

QUICK LINKS
ABOUT
SERVICES
PRODUCTS
TEAM
CONTACT US
QUICK LINKS APPOINTMENTS
BLOG/NEWS
FAQ
TEAM
INQUIRY

909 HIGH STREET SOUTH CORPORATE PLAZA TOWER 1, BGC TAGUIG PHILIPPINES

COPYRIGHT 2024 CYANCLAY | PRIVACY POLICY | TERMS OF USE